Cluster 16 interconnection requests
An independent look at the preliminary queue: technology mix, location, points of interconnection and requested online dates, with Cluster 15 for comparison.
226Requests
62.6 GWNet at POI
84%Of MW storage-backed
Open dashboard
cluster16.wattsinsight.dev
Mix by technology / GW